A cluster runs as long as nothing unplanned happens. An operations concept decides in advance what happens during updates, outages, staff changes and audits. The BSI module APP.4.4 Kubernetes sets five baseline requirements that can be bundled into one concept. This guide provides the outline with minimum content per chapter, a RACI template, the six operating processes and the documentation duties. As of October 2026.

Contents

What APP.4.4 requires and what an operations concept makes of it

The module APP.4.4 Kubernetes (2023 edition, German only) has 21 requirements. It must always be applied together with the module SYS.1.6 Containerisation and names IT operations as the role with primary responsibility. It does not prescribe a document called an operations concept. It requires planning (A1, A2), regulated permissions (A3) and a backup (A5). These contents belong in one concept, otherwise they remain in people's heads and in tickets.

Two documents have different jobs:

Operations concept Operations manual
Question What applies and who decides? How is it carried out?
Content Architecture, roles, rules, cadences, targets Steps, commands, contacts, restore order
Rate of change rare, on decisions with every change to the cluster
Readers Management, ISB, business owners, operations Operations, on-call, deputies

The concept refers to the matching section of the manual in each chapter. The manual belongs in version control like the configuration (A8 provides for versioned and annotated configuration files as a standard requirement).

The five baseline requirements in the original wording

The baseline requirements are the duties of the module worded with MUST. Titles and core statements follow the module. The module is published in German; the quotations are our translation.

No. Title Core statement Chapter in the concept
A1 Planung der Separierung der Anwendungen (planning the separation of applications) "Before commissioning it MUST be planned" how applications and their test and production environments are separated. "The planning MUST contain rules on network, CPU and persistent storage separation." 1, 2
A2 Planung der Automatisierung mit CI/CD (planning automation with CI/CD) Automation with CI/CD "MUST ONLY take place after suitable planning". The planning covers the "entire lifecycle from commissioning to decommissioning". "The role and permission concept and the protection of Kubernetes Secrets MUST be part of the planning." 5
A3 Identitäts- und Berechtigungsmanagement bei Kubernetes (identity and permission management) Every action is authenticated and authorised. "Administrative actions MUST NOT be anonymous." Users receive "ONLY the strictly necessary permissions". 3, 4
A4 Separierung von Pods (separation of pods) The node kernel isolates pods through Linux namespaces and cgroups, at least "IDs of processes and users, inter-process communication, file system and network including hostname". 2
A5 Datensicherung im Cluster (data backup in the cluster) Backed up are persistent volumes, configuration files, cluster state including extensions, etcd, infrastructure applications and the data of the registries. "Snapshots MUST NOT replace the backup." 7, 10

A4 is not a planning task. The concept records which runtime and nodes the isolation relies on and refers to the proof of verification. The standard requirements A6 to A12 add to the chapters below, for example A7 (network separation with whitelisting), A9 (service accounts) and A11 (health checks).

The outline: eleven chapters with minimum content and pass criterion

The table is the template. Each row is a chapter with its minimum content, the requirements it rests on and a pass criterion that a third party can verify without asking back. References to other modules (CON.3, DER.2.1, OPS.1.1.3, OPS.1.1.5, SYS.1.6) are additions from the compendium, not parts of APP.4.4.

No. Chapter Minimum content Reference Pass criterion
1 Scope and protection requirements Cluster and environments (test, production), list of applications with protection requirements, delimitation from SYS.1.6 A1 Every application has protection requirements and an environment. No namespace without an assignment
2 Architecture and separation Namespace layout (one application, one namespace), which applications share a cluster, network zones, rules on network, CPU and storage, isolation of pods A1, A4, A7 Every separation has a reason. Deviations are recorded
3 Roles and responsibilities RACI, deputies, contacts, division of tasks with the service provider A3, OPS.1.1.3.A2, DER.2.1.A3 Every task has exactly one accountable party. Contact details are current
4 Access and permissions Authentication for people and software, no anonymous administration, least privilege, who may create volumes and manage the CNI, service accounts A3, A7, A9 The RBAC export contains no unjustified cluster-admin binding. The default service account has no permissions
5 Changes and automation Pipeline lifecycle, secrets, pipeline permissions, versioned configuration, approval, rollback path A2, A8, A10, OPS.1.1.3.A1 Every change to the cluster traces back to a commit and an approval. The rollback path is described
6 Updates and patches Version strategy, assessment of new patches, maintenance windows, handling of versions without support OPS.1.1.3.A15 All components run a supported version. Every patch decision is documented
7 Backup and restore The six items from A5, procedures and times, separate target, retention, restore order, recovery targets, test cadence A5, CON.3.A2, CON.3.A4, CON.3.A12, CON.3.A14, CON.3.A15 For each critical application there is a restore record with date and duration
8 Monitoring and logging Health checks, alert rules, thresholds, responsible persons, log retention outside the containers A11, SYS.1.6.A7, OPS.1.1.5.A1 Every container has a readiness and liveness check. A test alert reaches the named person
9 Incident management Definition and classification, reporting paths, responsible persons, containment, recovery, follow-up DER.2.1.A1 to A6, A9 to A11, A17 One run-through (exercise) is documented. Escalation contacts are current
10 Infrastructure applications Registry, storage (CSI), CNI, pipeline, configuration store: access, encryption, permissions, logging, backup A12, A5 The five points of A12 are answered for each application
11 Documentation and review List of documents, storage, owners, review cadence, appendix for elevated protection requirements A8, DER.2.1.A2 The concept carries a date and an approval. The next review has a date

Chapters 7 and 4 provide the evidence that is easiest to verify: a restore record and an RBAC export. The article Kubernetes NIS2 and ISO 27001: evidence from the cluster shows the evidence for these. The pass criteria of the security layers are in the hardening checklist, those for operational readiness in the go-live checklist.

Roles and responsibilities: RACI template

APP.4.4 names IT operations as primarily responsible. The ISB ensures that the requirements are met and reviewed in line with the security concept and is involved in strategic decisions. Business owners come from CON.3 and OPS.1.1.3: they define the requirements of their applications for backup (CON.3.A1) and are primarily responsible for the patch and change management concept (OPS.1.1.3.A1). The table distributes these roles across operating tasks. It is a proposal by WZ-IT, not part of the BSI compendium. R = carries out, A = accountable (exactly one party per row), C = consulted, I = informed.

Task Business owners ISB IT operations Development team
Define protection requirements and environments (A1) A/R C C C
Plan architecture and separation (A1) C C A/R C
Maintain role and permission concept, review permissions (A3) C A R I
Pipeline and release approval (A2, A10) I I C A/R
Approve changes (OPS.1.1.3.A1) C C A R
Assess and apply patches (OPS.1.1.3.A15) I C A/R C
Set up backup (A5, CON.3.A4) C C A/R C
Test and record restore (CON.3.A15) C I A/R C
Define application health checks (A11) I I C A/R
Run monitoring and alerting (A11) I I A/R C
Handle a security incident (DER.2.1.A5) I C A/R C
Maintain and review the concept C A R C

With a service provider, the provider carries out (R) the rows of IT operations. Which rows these are is stated in the contract and in chapter 3; as a proposal, protection requirements, approvals and business ownership remain with the client. How tasks are split between provider control plane, service provider and self-operation is shown in Managed Kubernetes vs. self-hosted.

The six operating processes

The concept describes each process with sequence, evidence and pass criterion. Detailed execution belongs in the operations manual.

Updates

  1. New patch and minor versions are assessed promptly. OPS.1.1.3.A15 requires assessing and prioritising patches, deciding whether to apply them and, when a patch is not applied, documenting the reasons.
  2. Version planning follows the support period: a minor version is maintained for roughly 14 months, twelve in the standard period and two in maintenance mode (Patch Releases). Minor versions are not skipped (kubeadm upgrade). The kubelet must not be newer than the kube-apiserver (Version Skew Policy).
  3. For products without vendor support it must be checked whether they can still be operated securely; otherwise OPS.1.1.3.A15 prohibits their further use.

Evidence: version status per component, patch decisions, maintenance windows. Pass criterion: no component outside support. The schedule in detail is in the Kubernetes upgrade guide.

Backup and restore

  1. The concept lists the six items from A5 and assigns a procedure, time and target to each.
  2. Backups are stored on separate storage media (CON.3.A2), protected against unauthorised access and overwriting (CON.3.A14) and kept physically apart from the systems they protect (CON.3.A12).
  3. The restore is tested regularly, above all whether data can be restored "flawlessly and in reasonable time" (CON.3.A15). The test cadence is a proposal of the concept, for example quarterly per critical application.

Evidence: backup logs, restore record with duration. Pass criterion: all six items are covered, and no restore is older than the defined cadence. The four layers are explained in Kubernetes backup; etcd snapshots are described in the Kubernetes documentation.

Monitoring

  1. Every container defines health checks for startup and operation (A11). Based on the checks, Kubernetes is meant to delete or restart pods.
  2. Alert rules, thresholds and responsible persons are in the concept. Logs are retained outside the containers, at least on the container host (SYS.1.6.A7).
  3. For the API server, an audit policy defines which events are recorded and with which data. OPS.1.1.5.A1 requires a logging policy.

Pass criterion: a test alert reaches the named person within the agreed time.

Incident

  1. The concept defines what a security incident is and how it is distinguished from day-to-day disruptions (DER.2.1.A1), and names responsible persons and contacts (DER.2.1.A3).
  2. Affected parties are informed promptly, and reporting duties towards authorities and regulated sectors must be considered (DER.2.1.A4).
  3. For recovery: data from backups may only be restored if it was not affected by the incident, and credentials of affected components are changed beforehand (DER.2.1.A6).

Pass criterion: one run-through is documented, the contact list is current.

Access

  1. Every action on Kubernetes and the control plane is authenticated and authorised, including actions by automation (A3).
  2. Pods do not use the default service account; each application has its own with minimal permissions (A9). Only selected administrators manage the CNI and create volumes (A7, A3).
  3. The group system:masters bypasses all RBAC checks and cannot be revoked through bindings (RBAC good practices); the concept regulates who is a member.

Evidence: RBAC export with review note. Pass criterion: every far-reaching permission has a justification and an owner.

Changes

  1. Changes to components, software and configuration data follow a concept: planned, approved, documented, with a fallback solution. For larger changes the ISB is involved (OPS.1.1.3.A1).
  2. The cluster configuration is versioned and annotated in the management software, write permissions are minimal (A8). Pipelines work with the necessary permissions, with a separate process per user group (A10).
  3. The intended security level is maintained during and after the change (OPS.1.1.3.A1).

Pass criterion: for every change in recent quarters there is a commit, an approval and a rollback path.

Documentation duties

The table summarises which documents the concept presupposes. The "Update" column is a proposal.

Document Content Update Reference
Operations concept The eleven chapters above yearly and on change A1, A2, A3
Operations manual Steps, contacts, restore order with every change to the cluster CON.3.A4
Configuration in Git Target state of cluster, extensions, applications continuously A8
Change log Request, approval, rollback per change OPS.1.1.3.A1
Patch decisions Assessment, decision, reason when not applied per patch OPS.1.1.3.A15
Restore records Date, scope, duration, deviations per test CON.3.A15
Permission export with review note Bindings, groups, service accounts quarterly A3, A9
Incident records Sequence, measures, follow-up per incident DER.2.1

For elevated protection requirements

The requirements A13 to A21 are exemplary proposals whose adoption follows from a risk analysis. The concept lists them as an appendix with a decision per requirement: implemented, waived with reason, or not applicable. They include automated auditing against benchmarks (A13), dedicated nodes (A14), separate clusters for applications with very high protection requirements (A15), micro-segmentation (A18), high availability across several fire compartments (A19) and encrypted file systems including etcd (A20; for the API data in etcd see also encrypting data at rest).

Status and methodology

  • As of: 29 October 2026.
  • Sources of the requirements: APP.4.4 Kubernetes, 2023 edition, read in full; numbers, titles and quotations come from the original PDF. From CON.3, DER.2.1, OPS.1.1.3, OPS.1.1.5 and SYS.1.6 (each 2023 edition) only the requirements named are taken into account. Quotations are our translation of the German original.
  • Our own additions: outline, pass criteria, RACI and cadences are proposals by WZ-IT. They are not a BSI requirement and not an official mapping.
  • Kubernetes facts: documentation on kubernetes.io, retrieved on 29 October 2026.
  • Not included: legal interpretation, NIS2 duties (see evidence from the cluster) and the requirements of other modules, unless named above.

Our approach at WZ-IT

  1. Review the current state. The cluster audit compares the cluster with the CIS Kubernetes Benchmark and APP.4.4 and delivers a report with prioritised measures. It is a configuration review, not a penetration test. From EUR 1,490 net, one-off, creditable against the first month of operations.
  2. Distribute tasks. Which rows of the RACI table WZ-IT takes over is set by the scope of services and the service level.
  3. Operate. Managed Kubernetes operations takes over the operating processes: updates, backup, monitoring and incident response. Operations cost from EUR 590 per cluster and month including 3 worker nodes, net. Monitoring runs 24/7, the response to P1 incidents follows the service level (service levels).

Further guides

Sources

Review the cluster or hand over operations? The audit delivers the report on the cluster configuration, managed Kubernetes implements the measures. Cluster audit · Managed Kubernetes operations

Rather have it operated?

You'd rather not run Kubernetes yourself? WZ-IT handles setup, operations and maintenance - privacy-focused from Germany.

Enquiry

Design, take over, or operate Kubernetes

We design and operate Kubernetes on bare metal, Proxmox, and European cloud platforms, including networking, GitOps, observability, and backups.

  • Straight with Timo and Robin - no sales team, no pitch
  • A professional assessment of your situation
  • Concrete next steps for infrastructure, software or AI

The conversation is free and non-binding.

WZ-IT supported us professionally with the provisioning and setup of NetBird. Alongside the technical implementation, we also received well-founded advice on connecting our Kubernetes clusters. The recommendations were concrete and directly actionable. The collaboration was consistently reliable, fast and on equal terms. We can recommend WZ-IT without reservation.
Kai ClaußHead of Development, SweetConnect GmbH
Timo and Robin, founders of WZ-IT

Design, take over, or operate Kubernetes

WZ-IT supported us professionally with the provisioning and setup of NetBird. Alongside the technical implementation, we also received well-founded advice on connecting our Kubernetes clusters. The recommendations were concrete and directly actionable. The collaboration was consistently reliable, fast and on equal terms. We can recommend WZ-IT without reservation.
Kai ClaußHead of Development, SweetConnect GmbH

Frequently Asked Questions

Answers to the most important questions

Knowledge

More on Kubernetes

Companies worldwide trust WZ-IT

  • Stadtwerke Brühl
  • DGHO e.V.
  • solarwerkstatt berlin
  • Krüger Dirndl
  • ABCO Water Systems
  • Golem.de
  • EVADXB
  • nextGYM
  • AInergy
  • ml&s
  • Odiseo Solutions
  • Annota
  • ARGE
  • SweetConnect GmbH
  • Aphy AG
  • CORGOS
  • Rekorder
  • SolidProof
  • Yonju
  • Keymate
  • Paritel
  • Mr. Clipart
  • Millenium
  • Negosh
  • Führerscheinmacher
  • BTI
  • Deutsche Gesellschaft für Datenschutz
Read client reviews