[email protected]

US Cloud Providers: Compare European Alternatives

US Cloud Providers: Compare European Alternatives

Editorial note: The information in this article was compiled to the best of our knowledge at the time of publication. Technical details, prices, versions, licensing terms, and external content may change. Please verify the information provided independently, particularly before making business-critical or security-related decisions. This article does not replace individual professional, legal, or tax advice.

Assess a European destination: The Cloud Exit Check assesses the estate, target architecture and migration path. Arrange a consultation.

A Linode alternative in Germany could be a Linux server at Hetzner. For an environment with managed Kubernetes, a database and object storage, that answer is incomplete: the alternative must fit the services in use and the desired operating model. Hetzner, OVHcloud, Scaleway, IONOS and STACKIT are candidates whose documented building blocks we assess below.

This comparison starts from Linode/Akamai, DigitalOcean, AWS, Azure and Google Cloud. It distinguishes source services and potential target paths. The narrower guide Leaving AWS addresses destination selection from an AWS estate. As of October 2026. Selection and acceptance criteria here are our recommendations; we report no original benchmarks or customer tests.

Contents

Distinguish source providers by their services

Linode is part of Akamai. This matters for the search term: a Linode environment can contain several Akamai cloud products. Cloud Manager covers VMs, Kubernetes clusters, NodeBalancers and Object Storage, among other services. Akamai: completed Linode acquisition, Cloud Manager overview.

The table names selected documented products and the assessment tasks we derive from them. It claims neither completeness nor feature equivalence between providers.

Source provider Examples of documented services Capture before selecting a destination
Linode / Akamai Linodes, LKE, NodeBalancers, Object Storage Which components provide the application, networking and data layer?
DigitalOcean Droplets, Kubernetes, App Platform, Managed Databases, Spaces Which responsibilities belong to the platform service rather than your team?
AWS EC2, RDS, S3 and Lambda Which application paths depend on AWS APIs and permissions?
Microsoft Azure Virtual Machines, Azure SQL, Blob Storage and Functions Which identities, data models and integrations need replacing?
Google Cloud Compute Engine, Cloud SQL, Cloud Storage and BigQuery Which data and analytics capabilities does the destination actually require?

Our suggestion: one inventory row per service, with data volume, interface, dependencies and responsible team. An application using PostgreSQL and files calls for a different assessment from one using proprietary event or analytics services. This classification narrows provider selection; it does not replace technical validation.

Select European alternatives by workload

Two questions help build an initial shortlist: should the destination mainly provide infrastructure, or should the provider also take on platform tasks? And which functions must remain available from the application's perspective?

European candidate Documented building block Derived selection path
Hetzner Cloud servers, API and firewalls, private networks Assess a server-based design; explicitly assign administration of the OS, application and database
OVHcloud Managed Kubernetes Match platform scope, network integration and persistent data to existing container workloads
Scaleway Kubernetes Kapsule Assess a managed Kubernetes path; capture required integrations and operational boundaries
IONOS Managed PostgreSQL Match version, extensions, access and recovery requirements to PostgreSQL needs
STACKIT PostgreSQL Flex Check features and responsibilities for a managed PostgreSQL target design

The table deliberately shows one starting point per provider, without limiting its portfolio. A suitable database service does not establish a complete target environment. Networking, deployment, identities, backups and observability belong in the same design.

Our selection approach: start with two candidates covering mandatory functionality. For each open point, record the missing product documentation or contractual specification. This distinguishes a missing requirement from an unfamiliar administration interface. For the reverse starting point, see Hetzner alternatives.

Assess Linode beyond the VM plan

Linode Kubernetes Engine is a managed Kubernetes service. A destination composed of cloud VMs therefore starts with a different operating model, even if Kubernetes is later installed there. Akamai: LKE.

For migration from Linode to Hetzner, we recommend the following mapping as an assessment framework:

Existing component Decision before migration Suggested acceptance point
Linode VM with a local application Rebuild the target or select an appropriate transfer method Check boot, drivers, networking, services and the application
LKE with persistent volumes Plan the target cluster and storage integration separately Check data access, restart behaviour and recovery
NodeBalancer Specify target TLS, health check and forwarding rules Check reachability and failure paths
Object Storage Inventory API actions, permissions and delivery in use Check representative objects and required features
Managed database Select the target product and operational responsibility Check data, roles, queries and recovery

These table entries are planning recommendations, not claims about completed tests. If a managed service is replaced with a self-operated component, the cost picture needs to include that additional responsibility.

Object storage also needs a feature list: S3 compatibility does not establish complete feature parity. Hetzner documents unsupported bucket replication and tagging actions, for example. Before selecting a destination, identify whether code or processes use these features. Hetzner: supported S3 actions.

Assess data location and privacy separately

A European provider, a German region and GDPR-compliant processing are separate assessment points. Hetzner lists cloud locations in Germany and Finland, as well as the USA and Singapore. The provider name alone therefore does not determine data location. Hetzner: locations.

For processing on behalf of a controller, GDPR Article 28 sets requirements for processors and the contract. Article 32 requires technical and organisational security measures appropriate to the risk. Transfers of personal data to third countries are subject to Chapter V, beginning with Article 44. An EU location alone does not cover these requirements. GDPR: Articles 28, 32 and 44.

As technical preparation, we recommend a data-flow list: primary region, backups, logs, monitoring destinations, administrative access and subprocessors. For each entry, specify which contractual documents and evidence need assessment. Legal evaluation of the actual processing belongs with the responsible privacy and legal specialists.

Capture costs and operational responsibility in full

Our comparison framework includes ongoing infrastructure, platform services, traffic, licences and operations. One-off migration, application changes and parallel operations are recorded separately. Compare the same period, data volumes and required scope.

Cost block Recommended evidence
Compute and storage Resource inventory, utilisation, growth and a sized target design
Traffic and external connections Bills and directional data flows, including a potential partial migration
Managed services Current scope and the corresponding target scope
Operations and recovery Ownership of updates, backups, recovery and incidents
Migration and parallel operations Transfer method, adaptations, acceptance and rollback planning

Do not automatically set unknown values to zero. If target operational responsibility is missing, the calculation remains incomplete. This method does not establish a universal price winner; the article therefore provides neither savings percentages nor unverified tariff comparisons.

A partial migration should undergo the same assessment. In particular, document which services remain with the existing provider and which connections between environments will be needed permanently. The decision then becomes a bounded target design rather than an incomplete full migration.

Prepare the move with acceptance criteria

We recommend an acceptance checklist before implementation. For each application, it specifies required functions and the person responsible for judging whether they are met. Data and permissions also need a traceable validation method.

  1. Record the estate: Inventory services, resources, data, access, dependencies and contracts.
  2. Determine the destination: Specify product, region, operational responsibility and replacements for required interfaces.
  3. Design the data path: Describe initial transfer, ongoing changes, consistency checks and backups.
  4. Define acceptance: Have business workflows, permitted and prohibited access, and recovery checked.
  5. Plan cutover: Document write access, DNS, observation and rollback conditions.
  6. Clean up the source: Cancel and remove only after approval and assessment of retention and deletion requirements.

This sequence is a planning framework. It promises no effort, duration or uninterrupted migration. An unresolved mandatory criterion remains an open decision point until it is substantiated for the specific target path.

Our approach at WZ-IT

The Cloud Exit Check is the starting point when the provider or operating model remains open. The offer covers estate analysis, costs, dependencies, target architecture and migration path. For an established Hetzner destination, see Linode migration and DigitalOcean migration. The migration hub lists further source providers.

Useful enquiry material includes a service list, cost export, data volumes, desired regions and existing responsibilities. Implementation or operations scope follows the specific offer. Mentioning a cloud product in this comparison creates no additional WZ-IT partnership or operations commitment.

Further guides

Define destination selection and migration: The Cloud Exit Check assesses the estate and migration path. Arrange a consultation.

Sources

Timo Wevelsiep

Written by

Timo Wevelsiep

Co-Founder & CEO

Co-Founder of WZ-IT. Specialized in cloud infrastructure, open-source platforms and managed services for SMEs and enterprise clients worldwide.

Frequently Asked Questions

Answers to important questions about this topic

Companies worldwide trust WZ-IT

  • Stadtwerke Brühl
  • DGHO e.V.
  • solarwerkstatt berlin
  • Krüger Dirndl
  • ABCO Water Systems
  • Golem.de
  • EVADXB
  • nextGYM
  • AInergy
  • ml&s
  • Odiseo Solutions
  • Annota
  • ARGE
  • SweetConnect GmbH
  • Aphy AG
  • CORGOS
  • Rekorder
  • SolidProof
  • Yonju
  • Keymate
  • Paritel
  • Mr. Clipart
  • Millenium
  • Negosh
  • Führerscheinmacher
  • BTI
  • Deutsche Gesellschaft für Datenschutz
Read client reviews

Enquiry

Cloud Exit Check for provider selection

Assess existing services, target region and operational responsibility as the basis for migration.

  • Straight with Timo and Robin - no sales team, no pitch
  • A professional assessment of your situation
  • Concrete next steps for infrastructure, software or AI

The conversation is free and non-binding.

WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.
Jakob ÖschlbergerInno7 GmbH
Timo and Robin, founders of WZ-IT

Which decision are you preparing?

WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.
Jakob ÖschlbergerInno7 GmbH