Assessment: assess
Bandwidth / Egress
- Compare the current invoice and traffic profile
We migrate your Azure infrastructure to Hetzner - from VMs, Azure SQL, and Blob Storage to target architecture, testing, and cutover.
Cost Comparison
Cost factors for a web application
Assessment: assess
Assessment: assess
| Component | Azure | Hetzner | Assessment |
|---|---|---|---|
| Compute reference (4 vCPU, 8 GB) | F4s v2 (Linux): €0.1707/hour, about €125/month | €35.49* | after workload review |
| Storage | Premium SSD P15 (256 GiB): €36.79/month; Standard SSD E15 (256 GiB): €16.90/month | 160 GB local included; Volume €0.044/GB** | including backup design |
| Outbound traffic | Internet: first 100 GB free, then €0.0704/GB up to 10 TB, €0.0572/GB up to 50 TB | at least 20 TB included*** | by location and plan |
| Total / month | current spend | target architecture | project-specific |
Our Process
Six steps from inventory to agreed operations
We analyze your Azure infrastructure: VMs, databases, storage, network and dependencies.
Mapping your Azure services to Hetzner equivalents with optimized configuration.
Building Hetzner infrastructure parallel to Azure for seamless migration.
Transfer of databases, files, and configurations with a planned cutover and rollback point.
DNS switching, final synchronization and gradual traffic migration.
Performance tuning, monitoring setup and ongoing support.
Case Study
EVA Real Estate: AWS Migration with 81% Savings. A real estate agency in Dubai migrated its CRM and ERP infrastructure from AWS to Hetzner and saves $12,600 per year. Example from an AWS migration; not a forecast for other projects. This example is from an AWS-to-Hetzner project, not Azure; the figures are not a forecast.
EVA Real Estate: AWS Migration with 81% Savings
Read full case studyPricing
The initial consultation is free of charge. The cloud exit assessment, migration and operations follow the prices in the service catalogue.
The three steps build on each other without requiring each other. The analysis does not commit you to the migration, nor the migration to operations. All prices are net and exclude statutory VAT. The offers are addressed to businesses.
Answers to the most important questions
Further reading
Azure services and open-source target components compared
Reviews & projects
Cloud exit, Proxmox and sovereign operations with concrete results instead of architecture slides.
WZ-IT moved our studio infrastructure from decentralised individual devices to a central platform: every site is securely connected via VPN, new devices are onboarded automatically and an entire site is provisioned from a template, without manual steps on location. What impressed me most is the breadth and depth of their knowledge: Timo and Robin are not a typical IT provider who sets up a server and leaves. The two of them think their way into highly complex infrastructure and software topics, work through every requirement we put in front of them, and build networking, provisioning and operations so that everything fits together in the end. WZ-IT is an excellent partner for complex software, network and architecture projects.
Steve KirchnerManaging Director, nextGYM GmbH
International
WZ-IT designs, develops and operates infrastructure and software for clients in Germany and internationally. We deliver projects remotely and continue supporting them in ongoing operations after go-live.

Azure to Hetzner
Let us assess your Azure environment and show what a move to Hetzner brings.
The conversation is free and non-binding.
WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.
Jakob ÖschlbergerInno7 GmbH

WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.