[email protected]

Migrate Google Cloud (GCP) to Hetzner: compare costs, plan cutover

We migrate your Google Cloud infrastructure to Hetzner - from Compute Engine, Cloud SQL, and storage to target architecture, testing, and cutover.

  • Compare current costs
  • EU locations selectable
  • privacy-focused
  • Planned cutover and rollback
Reviews
Cloud Wolke HerausforderungServer NachhaltigkeitIT Beratung Service Consulting SoforthilfeTimo Wevelsiep Robin ZinsExperten für Innovation Migration AWSHetzner Hosting zuverlässig

Companies worldwide trust WZ-IT

  • Stadtwerke Brühl
  • DGHO e.V.
  • solarwerkstatt berlin
  • Krüger Dirndl
  • ABCO Water Systems
  • Golem.de
  • EVADXB
  • nextGYM
  • AInergy
  • ml&s
  • Odiseo Solutions
  • Annota
  • ARGE
  • SweetConnect GmbH
  • Aphy AG
  • CORGOS
  • Rekorder
  • SolidProof
  • Yonju
  • Keymate
  • Paritel
  • Mr. Clipart
  • Millenium
  • Negosh
  • Führerscheinmacher
  • BTI
  • Deutsche Gesellschaft für Datenschutz
Read client reviews

Cost Comparison

Google Cloud vs. Hetzner: Building a Reliable Cost Comparison

Typical cost savings for a web application

Assessment: assess

Bandwidth / Egress

  • Compare the current invoice and traffic profile

Assessment: assess

Managed Services

  • Assess managed services and operating effort

Transparent Pricing

  • No hidden costs, everything included
ComponentGCPHetznerAssessment
Compute reference (4 vCPU, 8 GB)current contract/invoice€35.49*after workload review
Storagecurrent contract/invoice160 GB local included; Volume €0.044/GB**including backup design
Outbound trafficPremium Tier to Europe: 1 GiB free; then USD 0.12 / 0.11 / 0.085 per GiB (up to 1 / 10 / above 10 TiB)at least 20 TB included***by location and plan
Total / monthcurrent spendtarget architectureproject-specific
  • Google Premium Tier, destination Europe, as of 18 October 2026. Standard Tier: 200 GiB free monthly. Compute and Persistent Disk require calculation by region, machine type, commitment and disk type. Google Cloud: Network pricing
  • *CPX32: €35.49 net/month, excluding IPv4 and VAT. Price effective 15 June 2026. Official cloud pricing
  • **Volumes are billed separately and are not included in server backups or snapshots. Volume details
  • ***For cloud servers at EU locations; verify plan and location before quoting. Traffic details
  • Note on pricing and savings: Prices, configurations, and savings estimates are based on publicly available data from the respective providers at the time of publication. Actual savings depend on workload, configuration, and current provider pricing. Please verify current terms independently with the respective provider.

Our Process

How Your GCP-to-Hetzner Migration Works

A proven 6-step process for secure migrations

  1. 01

    Assessment & Analysis

    We analyze your GCP infrastructure: Compute Engine, databases, storage, network and dependencies.

  2. 02

    Architecture Design

    Mapping your GCP services to Hetzner equivalents with optimized configuration.

  3. 03

    Parallel Setup

    Building Hetzner infrastructure parallel to GCP for seamless migration.

  4. 04

    Data Synchronization

    Transfer of databases, files, and configurations with a planned cutover and rollback point.

  5. 05

    Traffic Cutover

    DNS switching, final synchronization and gradual traffic migration.

  6. 06

    Optimization & Support

    Performance tuning, monitoring setup and ongoing support.

GCP Services and their Hetzner Equivalents

  • Compute Engine → Cloud Server (CPX/CAX)
  • Persistent Disk → Volumes (NVMe SSD)
  • Cloud Storage → Object Storage (S3-compatible)
  • Cloud SQL → Managed DB / Self-hosted
  • Cloud DNS → Hetzner DNS / Cloudflare
  • Cloud Monitoring → Prometheus + Grafana
  • Cloud Functions → Docker Container
  • VPC → Private Networks

Kubernetes

Migrating GKE clusters to Hetzner

Kubernetes resources usually carry over; the effort lies in the GKE-specific integrations. On Hetzner the target is a self-managed cluster, for example with k3s or Talos, whose control plane, upgrades and backups are part of the operating model.

  • What carries over

    Deployments, services, ConfigMaps, Helm charts and GitOps repositories run on any conformant Kubernetes cluster.
  • What gets replaced

    GKE load balancers and ingress, Persistent Disk as StorageClass, Workload Identity and IAM, Artifact Registry, plus Cloud Logging and Monitoring.
  • Target cluster on Hetzner

    Cloud Controller Manager for load balancers and networking, CSI driver for volumes, cloud or dedicated servers as nodes; persistent data moved via Velero or database backups.

Case Study

Why WZ-IT for Your Migration?

EVA Real Estate: Cloud Migration with 81% Savings. Example from an AWS migration: EVA Real Estate migrated to Hetzner and saves $12,600 per year according to the case study.

Cost reduction
81%
per month
$1,300 → $250
ROI
4 months
  • Cloud Migration Experience

    We plan inventory, test migration, cutover, validation and rollback for your GCP environment.
  • Controlled Cutover

    Validation and an agreed rollback window reduce cutover risk.
  • Full-Service Support

    Migration, managed hosting, monitoring and support from a single source - even after migration.
  • Proxmox Expertise

    We use Proxmox for professional virtualization with HA cluster and live migration.
  • Privacy & contracts

    German and Finnish locations are selectable. DPA, data flows and technical measures are documented for the target system.
  • Transparent Pricing

    Defined scope and a transparent proposal following the initial assessment.

EVA Real Estate: Cloud Migration with 81% Savings

Read full case study

Pricing

Analysis, migration, operations: three steps with a stated price

The initial consultation is free of charge. The cloud exit assessment, migration and operations follow the prices in the service catalogue.

Step 2 · Cloud migrationfrom €1,990 excl. VATTarget architecture, test run, data transfer and cutover with a defined scope. The amount depends on workloads and data.
Payment
  • SEPA direct debit
  • Visa
  • Mastercard
  • American Express
  • Apple Pay
  • Google Pay
  • PayPal
  • Bank transfer

The three steps build on each other without requiring each other. The analysis does not commit you to the migration, nor the migration to operations. All prices are net and exclude statutory VAT. The offers are addressed to businesses. Free & no obligation • ISO 27001 & BSI C5 datacenter

GCP Migration FAQ

Answers to the most important questions

Reviews & projects

Migrations with measurable business impact

Cloud exit, Proxmox and sovereign operations with concrete results instead of architecture slides.

Networking & Provisioning

WZ-IT moved our studio infrastructure from decentralised individual devices to a central platform: every site is securely connected via VPN, new devices are onboarded automatically and an entire site is provisioned from a template, without manual steps on location. What impressed me most is the breadth and depth of their knowledge: Timo and Robin are not a typical IT provider who sets up a server and leaves. The two of them think their way into highly complex infrastructure and software topics, work through every requirement we put in front of them, and build networking, provisioning and operations so that everything fits together in the end. WZ-IT is an excellent partner for complex software, network and architecture projects.
Steve KirchnerManaging Director, nextGYM GmbH
View project

International

Built in Germany's Ruhr Valley. Running worldwide.

WZ-IT designs, develops and operates infrastructure and software for clients in Germany and internationally. We deliver projects remotely and continue supporting them in ongoing operations after go-live.

Selected projects

Read client reviews

Google Cloud to Hetzner

Assess a Google Cloud-to-Hetzner migration

Let us assess your GCP environment and show what a move to Hetzner brings.

  • Straight with Timo and Robin - no sales team, no pitch
  • A professional assessment of your situation
  • Concrete next steps for infrastructure, software or AI

The conversation is free and non-binding.

WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.
Jakob ÖschlbergerInno7 GmbH
Timo and Robin, founders of WZ-IT

Which part should we assess?

You can select multiple areas. Then briefly describe the current estate.

Please do not submit credentials.

WZ-IT's advice on our Azure migration was technically sound and completely non-binding right from the intro call - we took away a great deal.
Jakob ÖschlbergerInno7 GmbH